欢迎来到保定金润机械设备有限公司!
    咨询热线:13903124561

升级PLC智能自动化的托辊生产线可明显提升生产效率

点击数:122025-11-13 00:00:00 

托辊生产线向智能制造升级的核心目标是提升生产效率、降低人工依赖、确保质量稳定性,以下是关键步骤和技术方案:
The core goal of upgrading the roller production line to intelligent manufacturing is to improve production efficiency, reduce manual dependence, and ensure quality stability. The following are the key steps and technical solutions:
1. 升级路径与关键技术
1. Upgrade Path and Key Technologies
升级方向关键技术/设备作用
Key technologies/equipment roles in upgrading direction
自动化生产 工业机器人(上下料、焊接、装配) 替代人工,24小时连续作业
Automated production industrial robots (loading and unloading, welding, assembly) replace manual labor and operate continuously 24 hours a day
数字化管控 可编程控制器(PLC)实时监控生产数据,优化排产
Digital control programmable logic controller (PLC) monitors production data in real-time and optimizes scheduling
智能检测 机器视觉(尺寸/焊缝检测) 自动识别缺陷,精度±0.05mm
Intelligent detection machine vision (size/weld seam detection) automatically identifies defects with an accuracy of ± 0.05mm
柔性化生产 快速换模系统 快速切换托辊型号
Flexible production rapid mold changing system for quick switching of roller models
预测性维护 IoT传感器+AI分析 提前预警设备故障
Predictive maintenance of IoT sensors+AI analysis for early warning of equipment failures
2. 核心设备升级清单原材料处理
2. Core equipment upgrade list and raw material processing
激光切割机(替代传统锯床,精度提升至±0.1mm);自动化料库(AGV搬运,减少人工干预)
Laser cutting machine (replacing traditional sawing machines, with accuracy improved to ± 0.1mm); Automated material warehouse (AGV handling, reducing manual intervention)
加工与焊接:数控车床(加工轴承座,圆度误差≤0.01mm);焊接机器人(搭载激光跟踪系统,焊缝合格率≥99.5%)
Processing and welding: CNC lathe (processing bearing seat, roundness error ≤ 0.01mm); Welding robot (equipped with laser tracking system, weld qualification rate ≥ 99.5%)
装配与检测:自动压装机(轴承装配压力可控,过盈配合零损伤);在线动平衡仪(检测托辊偏心量≤0.5g·cm)
Assembly and testing: Automatic press fitting machine (with controllable bearing assembly pressure and zero damage interference fit); Online dynamic balancing instrument (detecting roller eccentricity ≤ 0.5g · cm)
数据管理:数字孪生平台(虚拟调试,降低试产成本)
Data Management: Digital Twin Platform (Virtual Debugging, Reducing Trial Production Costs)
3. 实施效益
3. Implementation benefits
效率提升:人均产能从50件/天增至150件/天
Efficiency improvement: Per capita production capacity increased from 50 pieces/day to 150 pieces/day
质量改进:不良率从3%降至0.5%以下
Quality improvement: The defect rate has been reduced from 3% to below 0.5%
成本降低:能耗减少20%,人工成本下降60%
Cost reduction: Energy consumption reduced by 20%, labor costs reduced by 60%
【责任编辑:(Top) 返回页面顶端

下一篇:简述托辊钢管切管机的性能特点

上一篇:托辊铣扁机的类型